Case Study: Warehouse Cleaning Turnaround on the M4 Corridor, Lidcombe
This Lidcombe NSW 2141 case study covers a 3,400 square metre third-party logistics warehouse on an estate off the Parramatta Road light-industrial strip, minutes from the M4 corridor. The operator came to Pro Clean Corp after failing a client standards audit with one quarter to fix it. Client details are withheld at their request; the scope, machinery, pricing band and results below are as delivered. Pro Clean Corp services Lidcombe 2141 and surrounds.
The site
Six dock doors, selective racking to roughly eight metres, a 260 square metre mezzanine office, a driver amenities block and a hardstand yard shared with two neighbouring tenancies. Two shifts, six days a week, with inbound containers arriving from early morning and outbound freight loading late. Nothing about the operation left a convenient window in which the floor sat empty.
What had gone wrong
The previous contractor was, in effect, cleaning a warehouse like an office. Two cleaners with mops and a small walk-behind scrubber were expected to cover the whole slab in a three-hour visit. The arithmetic never worked, and the consequences compounded:
- Tyre marking and hydraulic film accumulated faster than it was removed, leaving a permanently grey slab that photographed badly in audit reports
- Racking uprights and beams had never been dusted — visible fibre and dust build-up at height, which the client auditor treated as a contamination risk
- Dock aprons carried shrink-wrap fragments, strapping and grease, creating both a housekeeping finding and a genuine slip hazard
- The mezzanine office and driver amenities were cleaned last with whatever time remained, which was usually none
The program we built
The fix was to stop buying hours and start buying machine time. We separated the work into a restorative phase and an ongoing phase:
- Restorative: two consecutive weekends of ride-on scrubbing with an aggressive pad and degreaser to lift the accumulated film, plus a full first-pass high-bay vacuum dust of racking and beams
- Ongoing floor: ride-on scrubbing of the full slab twice weekly, worked zone by zone with signage so live pick faces stayed open under the site traffic management plan
- Ongoing height: quarterly vacuum dusting of racking, beams and ledges with reach poles
- Docks and yard: monthly pressure washing of aprons, leveller pits and roller-door tracks, with grease spotting treated at source rather than spread
- Mezzanine and amenities: a nightly office-grade scope with high-touch disinfection, bathroom restocking and a signed checklist — deliberately ring-fenced so it could never be sacrificed to finish the floor
Cost and terms
The ongoing program priced within our standard Lidcombe warehouse band of $35 to $48 per hour, fixed as a monthly figure roughly 22 percent above the failing contract. The restorative weekends and first high-bay dust were quoted separately as one-off projects. Terms were month-to-month with 30 days notice, as with every agreement — the client was not asked to commit to a term to get the improvement. Comparable numbers are set out on our Lidcombe cost guide and rates page.
The result
The site passed its client standards re-audit in week nine with no floor or racking findings recorded. Dock slip incident reports fell to zero across the two quarters that followed. The operator subsequently added a second facility in the corridor to the same agreement at portfolio pricing. The full scope is described on our warehouse cleaning Lidcombe page, with process and plant environments covered under industrial cleaning and the equivalent large-format work at Chullora.
Case study FAQs
What kind of facility was this?
A third-party logistics warehouse of roughly 3,400 square metres in Lidcombe 2141, on an estate off the Parramatta Road light-industrial strip feeding the M4 corridor. Six dock doors, racking to about eight metres, a 260 square metre mezzanine office and a driver amenities block, operating across two shifts six days a week.
What was going wrong?
The incumbent contractor was cleaning a warehouse slab with mops and a domestic-grade scrubber. Tyre marking and hydraulic film built up faster than it was removed, racking beams had visibly never been dusted, and the dock aprons were carrying pallet-wrap and grease. The operator failed a client standards audit and was given one quarter to fix it.
What did the new program involve?
A machine-led rebuild: ride-on scrubbing of the full slab twice weekly, an initial restorative deep scrub over two weekends, quarterly high-bay vacuum dusting of racking and beams, monthly dock and hardstand pressure washing, and an office-grade nightly scope for the mezzanine and amenities. Crews were inducted on the traffic management plan and worked zone by zone with signage.
What did it cost?
The ongoing program priced inside our standard Lidcombe warehouse band of $35 to $48 per hour, converted to a fixed monthly figure. It landed roughly 22 percent above the previous contract, with the restorative deep scrub and first high-bay dust quoted separately as one-off projects.
What was the outcome?
The site passed its client standards re-audit in week nine with no floor or racking findings. Slip incident reports on the dock dropped to zero across the following two quarters, and the operator has since added a second site in the corridor to the same agreement.
Facing an audit on your Lidcombe warehouse? Book a walkthrough.
Request a Free QuoteBack to all Pro Clean Corp case studies.